Home Client Cases

Lay the foundation first, then build the building upwards

The commonality among the three cases is not the tools used, but the sequence: first, conduct a SCORE assessment and establish an improvement team, then introduce Lean tools and AI assistance. The data comes from statistics collected during the collaboration period authorized by the client.

Automotive Parts · Stamping Workshop

Changeover time overrun is the biggest bottleneck for OEE.

Pick Up

An automotive parts company operates three stamping lines with production on a three-shift basis. OEE has long hovered around 55%, and it takes half a day to resume the production cycle after a model changeover.

What was discovered during the SCORE phase?

The assessment showed sufficient commitment from management, but the organizational dimension scored low: There were no permanent teams or regular meetings for improvement, and issues were left to individual section leaders. After aligning the goals in the commitment phase, three cross-functional improvement teams were first formed based on the production lines, and weekly 30-minute problem-solving meetings were established.

What was done in the Lean and AI phases?

The improvement team used the AI-assisted Lean Module to align equipment signals with changeover records and found that 73% of slow cycles after changeovers occurred in the first three molds after the first-article inspection was passed, and that this was highly correlated with mold temperature rise. The team incorporated mold temperature preheating into the standard changeover procedure and established a minimum mold temperature checkpoint before first-article validation.

Results

In the sixth month of cooperation, the OEE of the three lines improved simultaneously, and changeover timeouts were significantly reduced. The improvement team continued to conduct reviews every two weeks, and the results remained stable.

55% → 72%
39 → 23
In the past, after completing a model changeover, we felt that it was "just slow," and no one could explain why. Now, the mold temperature is included in the standard operating procedure, and new employees just need to follow it. —— Supervisor of the stamping workshop of the enterprise
Electronics Assembly · SMT Assembly Workshop

Long-term misclassification of line stoppage reasons

Pick Up

The SMT line of a consumer electronics contract manufacturer experiences long unplanned downtime, but over 80% of the downtime records are marked as "equipment failure." The equipment department repeatedly performed repairs, but the problem was not resolved.

What was discovered during the SCORE phase?

Employee interviews (anonymous) revealed that front-line staff consider "reporting equipment malfunctions" to be the safest option, while reporting material shortages or procedural issues can lead to accountability. The assessment confirmed that the problem lies in the employee engagement dimension: there is no registration mechanism without accountability. Through the commitment process, the principle of "no performance deduction for reporting issues" was clarified with management.

What was done in the Lean and AI phases?

After the system adjustment, AI performed multi-source comparisons on downtime periods and identified that approximately 30% of "equipment failures" were actually due to waiting for missing materials, while about 10% were due to delays in program switching. Based on this, the improvement team adjusted the line-side material trigger points and the program changeover workflow.

Results

Within 12 months, unplanned line downtime was significantly reduced, the first-pass yield rate increased, and the distribution of downtime reasons recorded by employees more closely reflected the actual situation on-site, providing reliable data for subsequent improvements.

46 hours per month → 20 Hrs
91.2% → 97.8%
The real change is that everyone dares to tell the truth. Once the data is accurate, improvement becomes possible. —— SMT Workshop Manager of the company
Food Packaging · Filling Workshop

Near-expiry inventory resulting from overproduction

Pick Up

A food company's bottling line produces in large batches to "ensure supply," resulting in both finished product inventory and shelf-life pressures. After the peak season, there is often a need to deal with products nearing their expiration dates.

What was discovered during the SCORE phase?

The assessment showed a high level of management commitment, but inconsistent goals between departments: the production department focuses on output, while the supply chain department focuses on inventory turnover, with the two sides offsetting each other. The commitment stage incorporates production output and inventory turnover into a unified improvement target.

What was done in the Lean and AI phases?

Under the unified goal, the improvement team accepted and trialed AI's scheduling and cycle time optimization recommendations: rearranging batch sequences based on shelf life and delivery deadlines, and adjusting the trigger points for replenishment kanbans to reduce overproduction caused by delayed replenishment.

Results

Both work-in-progress inventory and inventory turnover have improved significantly, while supply fulfillment rates have not declined. The key is that only after the goals are aligned can scheduling recommendations have a chance of being adopted and implemented.

Baseline 100% → 73%
Baseline 100% → 122%
It's not that no one would use the production scheduling recommendations; it's just that the goals of the two departments were completely different before. Once the goals were aligned, we reached an immediate consensus on how to schedule production. —— Head of Production and Operations at the company
Commonality:

In these three cases, what really works?

The tools vary, but the sequence is consistent. This is also the path we recommend.

Assess first to identify where things are truly stuck.

Without an assessment, stamping companies might end up buying more expensive dies, and SMT companies might continue to replace equipment. If the problem is misclassified, the investment will be wasted.

Reach consensus first, then implement

In all three cases, the most valuable actions were not at the data level, but rather in the commitments: clearly stating no accountability, aligning goals, and empowering teams. These determine whether the subsequent tools can be used.

Put AI where it can be handled

In all three cases, AI played the role of "quickly finding evidence" rather than making decisions for people. Recommendations are validated by the team, and the results are fed back into the system, making the model more accurate with continued use.