Home / AI-Assisted Lean Manufacturing

On the foundation of SCORE, let AI integrate improvements into every shift.

AI-assisted Lean is not a standalone software project. It builds on the improvement teams, regular meeting mechanisms, and problem-logging habits already established by the SCORE five-step method, making it faster to identify problems and verify results.

Preconditions

Multiplication comes after a solid foundation.

When it comes to launching an AI dashboard, the results differ significantly depending on whether there is a SCORE foundation or not. The following is a comparison of two situations we observed at customer sites, not hypothetical scenarios.

With a SCORE foundation
The AI suggestion was claimed on the same day, and the on-site verification results were available at the team meeting the next day.The model receives real feedback every day.
No SCORE basis
The dashboard data looks good, but no one believes it, and no one is responsible for following up. A month later, the number of account logins dropped significantly.The tool has become a demonstration.
Our Approach
Conduct a round of SCORE assessments and form improvement teams before launch.Typically, adding 3–4 weeks of preparation time results in a threefold increase in the implementation rate.
Four modules

Covers the entire process of a single improvement

Each module can be used independently, but together they form a complete closed loop: identifying problems, pinpointing causes, adjusting solutions, verifying results, and establishing standards.

01

Real-time Waste Identification

The system aligns PLC signals, cycle time sensors, work order scanning, and video frame extraction from key workstations to the same timeline, automatically marking periods that do not match the standard cycle time and categorizing them according to the seven types of waste.

  • Multi-source timeline alignmentMillisecond-level alignment of equipment, work orders, and human factor records
  • Beat Deviation DetectionIdentify waiting, piling up, and process imbalances
  • Retention of Evidence FragmentsAutomatically capture charts and images of problem periods
02

Root Cause Diagnosis for Line Stoppages

Alarm logs usually only say 'where it stopped', rarely 'why it stopped'. The system extracts correlated factors from equipment parameters, material arrival records, program switches, and operator actions around the stoppage, and outputs verifiable root-cause hypotheses.

  • Line-stop semantic classificationBreak alarms into four types: equipment, material, program, human
  • Root cause hypothesis and verificationEach hypothesis comes with a suggested verification method
  • Affects labor-hour rankingPrioritize by actual OEE impact
03

Scheduling and takt optimization

Trading off lead time, changeover cost, equipment capacity and skills is planners' daily mental load. System offers candidate schedules and simulates line impact for evidence-based choices.

  • Changeover sequence optimizationMerge batches with same color and similar specs
  • Takt balance analysisIdentify bottleneck and surplus workstations
  • Scenario simulation comparisonCompare OEE of different production schedules on the virtual production line
04

Improvement closed-loop tracking

Every AI recommendation enters the EIT improvement team's issue tracking board, assigned to a workstation or team, with a verification window set; after results are obtained, before-and-after comparison is automatically completed and consolidated into standard work or rules.

  • Connect to EIT improvement team boardSynced with SCORE team regular meeting mechanism
  • Before-and-after effect comparisonBaseline before improvement vs. validation window data
  • Standard sedimentationValidated actions are added to the standard work checklist
Technical architecture

Collection at the edge, data stays on-site

AI The lean module shares the same account and permission system with the SCORE platform. Assessment scores, EIT improvement team, issue board, and production line data are linked within one platform.

Shop floor level
PLC / Data collection gateway Takt and photoelectric sensors MES / Work order export Key workstation video
Edge layer
Protocol conversion OPC UA / Modbus Data alignment and cleaning Frame sampling and event slicing Local cache
Platform layer
SCORE Assessment and learning EIT improvement team and issue board Waste identification and root cause reasoning Scheduling solver
Application layer
Improvement maturity and OEE dashboard In-shift reminders Improve task closure Management cockpit
Deployment Options

Select by data sensitivity

SCORE The assessment and learning module uses cloud service; the AI lean module can be deployed on-premise, hybrid or hosted per site conditions.

On-premises private deployment

The lean module is fully deployed on on-premise servers or private cloud, with data never leaving the factory. Suitable for large manufacturing enterprises with data compliance requirements and strong IT teams.

Delivery cycle approx. 6–8 week

Hybrid deployment

Edge collection and real-time dashboards stay on-site; complex inference and model training run in a hosted environment, with data transmitted after desensitization. The choice of most clients.

Delivery cycle approx. 3–4 week

Managed service

Subscribe per line per year, no on-premise server needed. Ideal for piloting on a single line before scaling after proven value.

Delivery cycle approx. 1–2 week
Capability boundary

What it cannot do

AI Without on-site experience, and will not make decisions for management. Clarifying these boundaries is to ensure every go-live has no inflated expectations.

Cannot replace process judgment

The root cause given by the system is a hypothesis and must be verified on site by process and equipment personnel. It improves the efficiency of finding causes, but cannot replace understanding of materials, equipment, and process.

Cannot correct bad data

If on-site signals are missing or work orders don't match reality, AI judgments will also be inaccurate. The data integration phase includes a data quality check and discloses it in the report.

Cannot replace SCORE's participation mechanism

Without an EIT improvement team and regular meetings to follow up, recommendations pile up into lists no one reads. So our approach always starts with SCORE assessment and team formation.

Does not decide production scheduling priority

Trade-off between delivery time and customer importance is a management decision. The system provides options and impact assessment; planners retain final decision.

Want to know which step fits your company now?

The free assessment tells you: whether to build the foundation with SCORE first, or if you are ready for AI-assisted lean.